Down Town Jebel Ali Infrastructure Works

Project Info:

The DJI infrastructure development work is divided into 4 zones and Al Rajhi Construction is performing infrastructural works with Al Marwan General Contracting LLc for Zone 3. The project involves 170,039 m2 of asphalt paving and 4,500 m2 of Interlocking Tiles. Also, a 150,000 m3 of earth work is included. In addition, a 98 km of water, fire ring, irrigation, sewage water, storm water, district cooling and electrical networks are being constructed.

Related Projects: